User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 30
Procedure 7-1 Powering Up the C abinet
The cabinet is powered up using the AC circuit breakers in the Load Center at the rear of the
cabinet and the DC circuit breakers on the distri bution panel on the front of the cabinet.
1.
Turn all of the DC circuit breakers to the Off position. Make sure that the Low Voltage
Disconnect switch is set to Automatic.
2.
Turn on the AC circuit breakers in the following order. Begin with the top, left breaker.
See Figure 7.3 Turning AC Breakers On.
• Utility Outlet
• Surge Suppressor
• Heater
• Heat Exchanger
• Continuing with the top right breaker : Battery Heater
• Rectifier #1
• Rectifier #2
• Rectifier #3
Figure 7.3 Turning AC Breakers On
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 30