User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 28
Chapter 7. Powering Up the Cabinet
The cabinet requires AC power to operate. Before attempting to power up the cabinet, verify that
AC power is available. It may be necessary to wait for a maintenance window to connect the
cabinet to AC power and perform this procedure.
WARNING:
ALL P OWER OPERATIONS SHOULD BE PERFORMED BY QUALIFIED
PERSONNEL ONLY. BEFORE ATTEMPTING TO POWER UP THE
SYSTEM, CONFIRM THAT ALL POWER CONNECTIONS HAVE BEEN
MADE PROPERLY.
The base station is powered up using the AC circuit breakers shown in Figure 7.1 AC Load
Center— Rear View and the DC circuit breakers shown in Figure 7.2 DC Power Distribution
Panel — Front View.
Figure 7.1 AC Load Center— Rear View
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 28