User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 26
Procedure 6-1 Connecting the Antenna Cables
1.
If they have not been removed already, remove the side access screw panels using a
tamper resistant insert hex bit. See Figure 3.2 Side Screw Panels.
2.
If they have not been removed already, remove the outer panel and seal inserts of the
Roxtec assembly on the rear of the cabinet. See Figure 4.5 Roxtec Assembly
3.
Route the antenna cable through the rectangular opening in the rear of the cabinet.
4.
Route the cable with the proper bend radius and connect it to the lightning suppressors
shown in Figure 6.3 Antenna Cable Installed.
Figure 6.3 Antenna Cable Installed
5.
Fully seat the connector and hand tighten with an appropriate tool. The cable connector nut
is 1 1/4” hex across flats.
6.
Repeat Step 3 through Step 5 for all antenna cables.
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 26