User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 21
2.
Route the cable through the existing cable grip in the T1 termination box as shown in Figure
5.4 T1 Termination Box Open. Seal by tightening the cable grip seal nut.
Figure 5.4 T1 Termination Box Open
3.
To install T1 using RJ-48 plugs, insert the plugs i n the connectors to the left of the 66
block. Begin with port 1 on top and continue down for additional ports. Up to 4 T1 ports
may be connected.
4.
To install T1 using the 66 block, expose an appropriate length of wire. Attach to the punch
down insulation displacing terminals according to the diagram in Figure 5.5 T1 Connections
on 66 Block.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
Page 21