User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 19
3.
Insert the c ables through the rectangular opening into the lower compartment of the cabinet.
4.
Route the cables through the internal cable clearance holes into the electronics
compartment. Figure 5.2 Cable Clearance Holes shows the clearance holes.
Figure 5.2 Ca ble C le arance Holes
5.
Reinstall the Roxtec seal inserts and outer panel after all of the system cables have been
routed. The seal inserts are installed tight against each cable and are held in place when
the outer panel is installed. See Figure 6.4 Cables Installed in Cabinet.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
Page 19