User's Manual

Table Of Contents
Page 14
Procedure 4-2 Connecting the Power Cable
1.
Locate the AC power connection points in the Load Center. See Figure 4.3 Load Center
Connections.
Figure 4.3 Load Center Connections
2.
Connect the power cable to the screw terminals for Neutral, Ground, Line 1, and Line 2.
Use #12 AW G wire or heavier.
3.
Connect the other end of the cable to the AC power source in the Service Entrance.
RadioRouter
®
BaseStation Installatio n Gu ide Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 14