User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 11
Procedure 3-3 Mounting the Cabinet to the Concrete
Once the cabinet has been moved to its final location, it must be bolted to the concrete.
1.
Align the clearance holes in the base of the cabinet to the threaded holes in the concrete.
2.
Bolt the cabinet to the concrete using 3/8” diameter bolts, 1” minimum length, and flat
washers. Use corrosion resistant screws and washers.
3.
Tighten the bolts to 180 in-lb +/- 25 in-lb.
4.
Replace the rear and side access panels after all of the system cables have been routed.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
Page 11