User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 8
5.
Locate the battery tray on the front of the cabinet. See Figure 3.3 Battery Tray — Front View.
Figure 3.3 Battery Tray — Front View
6.
Unscrew the two screws in the front of the tray. Use a 7/16” socket for the hex head bolts.
7.
Unlock the tray lock with a Southco Belcore 216 key part number E3–12–1.
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 8