User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 4
Locate the anchors to match the mounting hole pattern of the outdoor cabinet assembly. There
are a total of 6 clearance holes in the base of the cabinet, 1 in each corner and 2 located centrally.
Figure 2 .1 Clearance Hole in Base of Cabinet shows the clearance hole in the rear right corner of
the cabinet near the antenna connections. Figure 2.2 Clearance Holes in RadioRouter Base —
Bottom View shows the location of all six holes.
Figure 2.1 Clearance Hole in Base o f Cabinet
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 4