User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 2
ESD CAUTION:
It is the responsibility of the installer to ensure that all necessary
precautions are taken to avoid electrostatic discharge damage to the
equipment.
Note:
All installation work must be coordinated with the carrier to insure compliance with carrier require-
ments regarding scheduling work during maintenance windows.
1.1. Installation Equipment
In addition to standard installation tools, you will need the following:
• Southco Belcore 216 key — part number E3–12–1.
• Tamper resistant insert hex bit — Wiha part number 71940 is required.
• Handle hex tool key — Sierra Pacific part number 392–K or equivalent.
• Conduit pull box with hole diameter 1.375” to 1.50”.
It is recommended that special equipment be used to move the RadioRouter cabinet. The
following list gives examples of equipment which can be used:
• Pallet jack with 27” width across the jacks. Pallet jack 4YX97 from Dayton or equivalent.
• Hoist or crane with heavy duty str uctural straps or chains — 1500 lb load capability.