User's Manual
Powering Up the Cabinet
Chapter8.PoweringUptheCabinet
The cabinet require s DC powe r to operate. Before attem p ting to power up the cabinet, verify that
DC power is available. It m a y be necessary to wait for a maintenance window to connec t the
cabinet to DC power and perform this procedure.
WARNING:
ALL POWER OPERATIONS SHOULD BE PERFORM ED BY QUALIFIED
PERSONNEL ONLY. BEFORE ATTEMPTING TO POWER UP THE
SYSTEM, CONFIRM THAT ALL POWER CONNECTIONS HAVE BEEN
MADE PR OPERLY.
8.1. Powering Up the Cabinet
The cabinet is powered up using the circuit breakers on the distribution panel on the front of the
cabinet. See Figure 8-1: Distribution Panel with Circuit Breakers — Front View.
For this procedure you will nee d a volt meter.
© 2005 Flarion
Flarion Proprietary and Confidential
Version 1.7
Page 8-1