User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
v
TABLE OF CONTENTS
1. Overview.....................................................................................Page 1
2. Verifying the Site Preparation ............................................................Page 3
2.1. Site Preparation Checklist — Indoor BaseStation ...............................Page 3
2.2. Preparing the Floor ...................................................................Page 4
3. Installing the Cabinet ......................................................................Page 6
4. Connecting the Power System ......................................................... Page 11
4.1. Routing the Cables ................................................................. Page 11
4.2. Connecting to Power and Ground................................................ Page 16
5. Connecting the Core Network Cables................................................. Page 21
6. Connecting the Antennas Cables...................................................... Page 26
7. Installing the Alarm Connection s ...................................................... Page 30
8. Powering Up the Cabinet................................................................ Page 32
9. Powering Down the Cabinet ........................................................... Page 36
10. Verifying the Installation ............................................................... Page 37
10.1. Verify ing the Phy sical Installation............................................... Page 37
10.2. Verify ing the Base St a tion Operation .......................................... Page 37
LIST OF PROCEDURES
Procedure 3-1 Removing the Cabinet from the Pallet ...................................Page 6
Procedure 3-2 Lifting the Cabinet ...........................................................Page 9
Procedure 3-3 Mounting the Cabinet to the Floor ...................................... Page 10
Procedure 4-1 Rout ing Cables T h rough the Cable Entry Port........................ Page 12
Procedure 4-2 Connecting the Power Cables ........................................... Page 18
Procedure 4-3 Connecting the Ground Cables ......................................... Page 19
Procedure 5-1 Connecting to the Net work via T1 ...................................... Page 21
Procedure 5-2 Connecting to the Net work via Ethernet ............................... Page 24
Procedure 6-1 Connecting the Antenna Cables ........................................ Page 29
Procedure 8-1 Powering Up the Cabinet................................................. Page 33
Procedure 9-1 Powering Down the Cabinet ............................................. Page 36
Procedure 10-1 Communicating with the Core Network .............................. Page 37
LIST OF TABLES
Table 8.1 Power On Expected LEDs...................................................... Page 35
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
v