User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 33
Procedure 8-1 Powering Up the Cabinet
The cabinet is powered up using the circuit breakers on the distribution panel on the front of the
cabinet. See Figure 8.1 Distribution Panel with Circuit Breakers — Front View
Figure 8.1 Distribution Panel w ith Circuit Breakers — Front View
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page 33