User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 29
Procedure 6-1 Connecting the Antenna Cables
1.
Route the antenna cable from the top and screw mount it to the mating connector. The
connector nut is 1 1/4” hex (across flats).
2.
Fully seat the connector and hand tighten with an appropriate tool. The connector may
be tightened from either the rear or top.
3.
Repeat Steps 1 and 2 for all antenna cables.
4.
Reinstall the cable access panel. Make sure the rubber edging is tight against the cables.
Figure 6.4 Top of Cabinet with Two Antenna Cables Installed shows two antenna cables
installed.
Figure 6.4 Top of Cabinet with Two Antenna Cables Installed