- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 10
Procedure 3-3 Mounting the Cabinet to the Floor
Once the cabinet has been moved to its final location, it must be bolted to the floor.
Note:
If the rear panel is to be reinstalled and there is not sufficient rear clearance to reinstall the panel
in place, the panel must be reinstalled prior to mounting the cabinet.
1.
Align the clearance holes in the base of the cabinet to the threaded holes in the floor.
Although there are two clearance holes in each corner, only one is necessary for mounting.
2.
Screw the cabinet to the floor using 1/2” diameter screws and flat washers.
3.
Tighten the screws to 400 in-lb +/- 25 in-lb.
4.
Replace the front access panel after all cables have been routed and connected.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003