User's Manual

Software User Manual
©FJ Dynamics Technology Co., Ltd. All rights reserved.
32
Figure 3.3.7 Guidance line imported
3.2 Preparatory Operation for Advanced Mode
Figure 3.3.8 Preparatory operation flow chart
3.2.1 Confirm the Source Connection
Before preparing the operation, please confirm the current source
connection. For the specific operation steps, see 2.5 Select Correction
Source.
If the RTK connection is normal, drive ahead and accelerate the vehicle
for more than 5sOnly one operation is required for each startup.
3.2.2 Add and Select Fields
Click Task button on the left to enter the task configuration interface.
First, add and select an operation field.