Installation Instruction
Hardware Installation Instruction for FJDynamics Autosteering Kit
© FJ Dynamics Technology Co., Ltd. All Rights Reserved
31
3. There shall be no tall trees, buildings and other obstacles affecting the satellite signal around the
debugging site.
4. There shall be no high voltage wire within 150m around the debugging site.
5. The debugging site shall be horizontal, with a length not less than 50m and a width not less than 10m.
6. The floor of debugging site shall be paved with cement or asphalt.
7. The debugging site shall not be on a public road. During the debugging, there shall be no irrelevant
personnel around the agricultural machinery to prevent personal injuries.
5.2 Power-on and Startup
5.2.1 Inspection before power-on
1. Check whether the power connection is correct
2. Check whether the power supply voltage is consistent with the requirements
5.2.2 Inspection after power-on
1. Check whether the control terminal power light is on after power-on.
3. Check whether the control terminal program can be started normally after its power switch is pressed.
5.3 Parameter Calibration
For details on parameter calibration, please refer to Section 2, Chapter IV of the accompanying Software
Operation Instruction for FJDynamics Autosteering Kit.