Installation Guide
Framed Floor Vent
[Lite]
Install Guide
Materials Needed
- Pre-cut piece of surface material for tray insert.
(Size will vary for vent sizes).
- Bonding material (will vary for flooring materials).
*NOTE*
- If duct opening is larger than the Base of the vent, use
additional screws to add strength.
Apply even pressure so the floor
material is level to rim of Tray.
Let cure.
Insert vent in place.
Enjoy!
Apply adhesive bond in Tray.
Insert pre-cut flooring material.
*Control Air Flow*
No airflow included with this model. See which Lite Dampers are
compatable with this product at www.ariavent.com
Additional Support
support@fies.com / www.fies.com
Made in Canada
BONDING AGENT
1
PRE-CUT INSERT
2
3 4
5