Frameless Installation Guide

13
A
C
B
6 CAVITY PREPARATIONS
MINIMUM CAVITY DIMENSIONS inches (mm)
A
Overall height of cavity 80/84” (2032/2134)
B
Overall width of cavity 36” (914)
C
Overall depth of cavity 24¾” (629)
ELECTRICAL SPECIFICATIONS
Supply 115VAC, 60Hz
Service 10 amp circuit
PLUMBING SPECIFICATIONS
Supply ¼” comp. Stainless steel braided hose
Pressure Minimum 22 psi (150 kPa)
Maximum 120psi (827kPa) @ 68°F (20°C)
Note: electrical connection can be located in an adjacent cabinet to either side of the fridge or above the fridge cavity.
Alternative area above cavity
for electrical connections
Electrical
Plumbing
Electrical
Plumbing
A
C
B
Floor
2⅞” (73 mm)
29¾” (756 mm)
5⅝” (143 mm)
Left side of cavity
Electrical and water connections must be within
this space if located behind the refrigerator
REAR OF CAVITY
2” (51mm)
Frameless: Finished return
top and sides
E
B
H
C
ADA
J
I
L G
C
B
F
F
F
K
3½”
(89 mm)
⁄” (4 mm)
IMPORTANT!
For ease of installation, ensure cavity width is consistent top to bottom and height is
consistent left to right.