Installation Guide
Table Of Contents
- Safety and warnings
- General installation information
- Parts supplied for installation
- Tools needed for installation (not supplied with the appliance)
- Model identification
- Prior to installation
- Product dimensions
- Clearance dimensions
- Fitting the optional backguard
- Location of electrical supply
- Ventilation requirements
- Fitting the adjustable feet
- Moving the range
- Installing the anti-tip bracket
- Electrical connection
- Connection of the power supply cable
- Gas connection
- Flame testing
- Leak testing
- Gas conversion
- Adjusting the minimum burner settings
- Final checklist
21
TO BE COMPLETED BY THE INSTALLER
GENERAL
Placement of unit.
Specified clearance maintained to cabinet surfaces.
Unit Level – front to back, side to side.
All packaging material and tie straps removed.
Island trim or optional backguard correctly attached.
The anti-tip bracket is correctly installed.
ELECTRICAL
Adequate ground connection.
GAS SUPPLY
Site gas supply is compatible with range model, and sufficient pressure is available
(see section ‘Gas connection’).
The pressure regulator (Natural Gas) or the test point adapter (ULPG) are connected
and correctly set for the type of gas.
Unit tested and free of gas leaks.
OPERATION
All internal packing materials removed. Check below the cooktop grates and
inside the oven.
If converted for use with ULPG, confirm that the test point adapter and cooktop
burner injectors have been correctly set for use with ULPG.
Dials turn correctly and freely.
Each burner lights satisfactorily, both individually and with other burners operating
at the same time.
The oven display is functioning correctly and the oven is heating when turned on.
Oven door hinges seated and door opens and closes properly.
Cooktop grates are correctly positioned, level, and do not rock.
Cooktop burner flame correct.
Complete and keep for safe reference:
Model
Serial no.
Purchase date
Purchaser
Dealer address
Installer’s name
Installer’s signature
Installation company
Installation date
FINAL CHECKLIST