Manual
nsta ation instructions
Assembly of chimney cover
Mark the wall at the location of support C (FigAa) according to the heights and specifications
shown on the mounting template. .J
--Z: : .
_J
Fig3 Mounting temp/dt_
Drill hoBes in the wall, pBace anchors in the hoBes and attach support C with screws (Fig.4a).
Phce tube A with the extendiMe part S hanging on the inside, making sure that flange D is
correctly lodged in the support c (Fig.4a).
Next, secure support E to the upper end of the wall, making sure that it is properly aligned with
the extendible tube. Extend the movable part of tube S until it reaches support E and connect
to the support with the two side screws F (FigAb).
C
D
/
E F
Fig4b