Product Manual

Page 10
English Customer Service: 1-844-FIRMAN1
12
14
15
Parallel Operation Outlets - These outlets are used
for connecting two FIRMAN inverter generators for
parallel operation. A FIRMAN parallel kit(optional
equipment) is required for parallel operation.
12V DC outlet 8.3 Amp of DC current may be drawn
from this receptacle.
Use this outlet to charge 12V automotive type
batteries ONLY. See 12V DC outlet (Battery
Charger) section.
16
DC Circuit Breaker - The circuit protector may be reset
by pushing the button of the protector.
Ground Terminal – Consult an electrician for local
grounding regulations.
17
18
Outlet Cover - Protect the receptacles from dust
and debris.
LPG Regulator Solenoid Port
Recoil Stater
Choke Button
12V DC Battery Charger Port - Plug the 120 Volt
AC charger into this port to charge the generator
battery.
13
19
Battery Cable Connection
1.Unscrew the maintenance cover by provided
screwdriver.
2. Cut wire tie that is binding the black battery
cables A and B.
3. Insert the male connector of cable A into
female connector of cable B.
4. Reattach the maintenance cover.
Follow below instruction to connect battery to
the generator:
LPG Hose Quick Connect Inlet
20
21
22
Fuel Selector Switch Used to select and turn on
gas or LPG fuel source.
-
Regulator Cover Installation
A
B
C
D
Follow below instruction to install the LPG
regulator cover:
1, Place the LPG regulator cover A over the LPG
regulator B.
2, Use M5X14(QTY:3) C and M5X35(QTY:1) D
screws to tighten the LPG regulator cover.