Overview of Primary Product

7
£
The DIP switches are located on the logic module, which is mounted in the second position from the
left on the motherboard next to the relay module.
To gain access to the DIP switches, the cover of the logic
module must be removed. To do this, remove the four screws
which hold the cover onto the motherboard. Then gently pull
the logic module towards you to disengage the logic module
from its mating connector. Located on the outside of the
cover is a label describing the function of the DIP switches.
For all dip switches, the ON position is toward the top of
the logic board.
S2 DIP Switches
The S2 DIP switches permit programming of timing and sequence functions of the Fireye Multi-
Burner Control System.
SW1: Recycling mode selection (On = Recycling, Off = Non-Recycling).
SW2: Pilot selection (On = Intermittent, where pilot remains on during burner cycle;
Off = Interrupted where pilot valve closes after main burner is established).
SW3: Pilot Trial for Ignition range selection; see table for proper selection.
SW4 through SW8: Purge time selection (switch settings are additive); see table for exact times.
SW
POS
S2 DIP SWITCH POSITION
PURGE TIME
SW8 OF S4 = ON
EXTENDED PURGE TIME
SW8 OF S4 = OFF
8 ON OFF ON OFF
OFF TO SELECT OFF TO SELECT OFF TO SELECT OFF TO SELECT
7 120 SEC. 8 MINUTES 8 MINUTES 32 MINUTES
6 60 SEC. 4 MINUTES 4 MINUTES 16 MINUTES
5 30 SEC. 2 MINUTES 2 MINUTES 8 MINUTES
4 15 SEC. 1 MINUTE 1 MINUTE 4 MINUTES
PURGE TIMES ARE ADDITIVE
CAUTION: PURGE TIME IS 0 IF SW4 TO SW8 SET TO ON
PURGE TIME IS MAXIMUM IF SW4 TO SW8 SET TO OFF
3 SEE TFI TIMING CHART
2 INTERMITTENT PILOT INTERRUPTED PILOT
1 RECYCLING NON-RECYCLING
POS ON OFF
S2
S6
S4
ON
OFF
WARNING: THE INAPPROPRIATE SELECTION OF DIPSWITCHES COULD RESULT
IN AN UNSAFE CONDITION HAZARDOUS TO LIFE AND PROPERTY. Changing the
dipswitches modifies the operation of the Multi-Burner Control System. Care should be
taken to insure the proper dipswitch settings. Setting the dipswitches for a particular appli-
cation should be made by a competent professional, such as a Boiler/Burner technician
licensed by a state or government agency, engineering personnel of the burner, boiler or fur-
nace manufacturer (OEM) or in the performance of duties based on the information from
the OEM.