User Manual

Firetide Instant Mesh Networks 7 February 2007
Indoor Node Installation
Indoor node installation is straightforward. Place the unit on a
table or shelf, or use the optional bracket to attach it to a wall, ceil-
ing, or cubicle partition. Attach the antennas, keeping in mind that
all antennas on all units should be parallel - typically vertical. Apply
power. The power LED should illuminate immediately; after about 60
to 90 seconds, the status LED should switch to steady green.
Firetide recommends that you power up and configure all nodes on
a table or bench before deployment. Use HotView or HotView Pro to
configure your mesh.
Note the location of the reset button in the lower right corner of the
rear panel. A paperclip can be used to reset the unit after it has fully
booted and the status light has come on.
Figure 1. AC Power Brick
Figure 2. Optional Mounting Bracket
8mpadaYjqÛ9jY[c]l DYafÛDgmflaf_Û9jY[c]l
?glGgjlÛD]k`ÛEg\]
Figure 3. HotPort 6100 Series Mesh Node - Front View
Figure 4. HotPort 6100 Series Mesh Node - Rear View