Instructions / Assembly

6
Part Number 18143, D, 11/07/2017
Installation
Installing the Display Unit (P1BR-S01-D/P1CR-S01-D & P2BS-S01D)
The Display Unit should be located at the instrument panel, so that the visible and
audible indicators may be easily observed.
Drill a 2-1/16” hole to accommodate the P1BR-S01-D/P1CR-S01-D Display Unit.
Drill a 2-1/8” hole to accommodate the P2BS-S01-D Display Unit.
Insert Display Unit into hole and secure with the provided threaded mounting nut.
NOTE
DO NOT MAKE ELECTRICAL CONNECTIONS AT THIS TIME. THEY WILL BE ADDRESSED IN A LATER
SECTION.
Installing the Solenoid Valve (SV-1) for LPG Applications
The Solenoid Valve should be mounted on the tank side of the LPG regulator, as close to
the tank as practical. The tank itself should be mounted outside the cabin or crew
quarters to avoid the possibility of gas accumulation due to a leak.
NOTE
TIGHTEN TO 12-13 FT/LBS. DO NOT OVER-TIGHTEN.
NOTE
ALL PIPING MUST BE CHECKED FOR LEAKS. USE SOAPY WATER SOLUTION ON ALL
JOINTS. NEVER USE A FLAME TO CHECK FOR LEAKS.
Routing Sensor Cable(s) (FS-X01 CABLE XX’)
A 20 FT Sensor Cable is provided for each Propane Fume Sensor. The Sensor Cables
should be routed starting at the Display Unit, then to the pre-determined location of the
Propane Fume Sensor. Connect to the Display Unit using the attached quick-disconnect
connectors. Take care not to pinch, break, or cut the Sensor Cable or put too much
stress on the connectors while routing the cable. Secure the Sensor Cable with the
appropriate hardware for the application.
NOTE
DO NOT CUT EXTENSION CABLE FOR ANY PURPOSE. DOING SO VOIDS THE PRODUCTS
WARRANTY. LONGER CABLES ARE AVAILABLE FROM 20 FT TO 100 FT.