Installation Instruction

Note: Each side of the unit has a tab just
behind the control panel. These tabs
prevent the control panel from moving
inward. If the tabs interfere with the
unit sliding in (see Fig. 9-1), use pliers
to bend them inward so that they clear
the enclosure sides. Leave the tabs
slightly out to ensure they still keep
the control panel from moving inward
(see Fig. 9-2).
To install using a power supply box:
a. Install the power supply box at least 12
inches below the bottom of the double
searing station.
b. Fasten the power supply box to the inside of
the enclosure, making sure the vent holes
are not blocked.
c. Connect the power supply box to the searing
station, as shown in Fig. 9-3 (molex and
ground wire connections).
d. Plug the power cord into a properly wired
and inspected GFI receptacle (not included).
Use a heavy duty grounded extension cord
if necessary.
e. Slide the unit into the enclosure.
Fig. 9-3
Wires from searing station
CONNECT
Power
supply box
Power cord
Fig. 9-1 Tab may interfere when sliding in unit
Fig. 9-2
Tab slightly bent in for clearance
INSTALLATION (Cont.)
9
L-C2-380
Rev 1 - 1401131425