Overview of Primary Product
page 4
Assemble the VRV balance weight onto the gate. Screw the weight all the way in. Then attach lock nut 10.
and knurl nut. (See Figure 6)
Mount the VRV assembly onto the tee and fasten with the supplied screw and nut in collar tabs. To ensure 11.
proper operation, check the gate for being level across the pivot points and plumb.
(See Figure 7)
Figure 6
Figure 7