Submittal Sheet
Page 2
Figure 5
SEE THE APPLIANCE MANUFACTURER’S INSTRUCTIONS FOR THE SPECIFIC LOCATION.
IF THE APPLIANCE MANUFACTURER DOES NOT SPECIFY A LOCATION
,
REFER TO FIGURE 5.
INSTALLATION
M
OUNTING JUNCTION BOX
The junction box can be mounted at the venter or remotely mounted away
from the venter. (See Figure 1 & Figure 2)
1. Remove one of the knockouts from the side of the junction box where
the pressure switch is mounted. Install the flexible conduit connector
onto the CK-63 Junction Box and secure with fastening nut. If remote
mounting the CK-63 Junction Box, mount the flexible conduit connector
onto a 2" x 4" installer supplied junction box.
2. Fasten the flexible conduit from the SWG Venter into the conduit
connector. Mount the CK-63 Junction box or installer supplied junction
box onto the wall or floor joist without straining the flexible conduit.
Fasten the CK-63 Junction Box through the four dimpled locations on
the base of the box. (See Figure 3)
O
IL FIRED SECONDARY SAFETY SWITCH
Installation of a SECONDARY SAFETY SWITCH is recommended for
detecting a blocked flue system and/or inadequate draft.
M
OUNTING IN THE VENT PIPE
1. Drill or pierce a clean hole (about 3/4” diameter) in the vent pipe near the
appliance outlet. (See Figure 5)
2. The heat transfer tube must have the fiber gasket installed against the
mounting plate before attaching the unit to the vent pipe
3. Insert the heat transfer tube with gasket into the 3/4” diameter hole placed in
the vent pipe during step 1.
4. Secure the assembly to the vent pipe with a minimum of 4 sheet metal
screws. The channel must be mounted horizontally, unless specified
differently by the appliance manufacturer. (See Figure 5)
CAUTION:
Disconnect
electrical power supply to the
appliance when wiring the
blocked vent switch.
P
RESSURE SWITCH SENSING TUBE
INSTALLATION
1. Attach the 1/4 inch tubing connector to the pressure tube on the SWG Venter. (See Figure 3)
2. Connect the supplied 1/4" aluminum tubing to the tubing connector. Route the tubing to the CK-63 Junction
Box and connect the tubing to the pressure switch. When routing the tubing avoid kinking the tubing by
bending the tubing too sharply.
3. For remote mounted CK-63 Junction Box, use a 1/4" OD copper, aluminum or plastic tubing and route the
tubing to avoid contact with any heat source.
Refer to the SWG Venter installation instructions for setting system airflow.
Figure 1
Figure 2
Figure 3
Figure 4
WARNING:
Switch connection channel
must be mounted
horizontally, unless specified
differently by the appliance
manufacturer.