Submittal Sheet

Model UDB
Under Duct Mounting Bracket
SUBMITTAL SHEET
®
1) Apply gasket around perimeter of bracket (see illustration).
2) Find a suitable location to install the humidifier in the supply or return plenum.
3) Place the template on the bottom of the duct in the location the humidifier is to be installed
Make sure no other internal components exist in that location that may be
damaged. i.e. Evaporator Coil, UV Lamp, etc..
4) Line the front edge of the template with the corner of the duct and tape in place.
5) Drill 8 holes shown on the template using an 1/8” drill bit (DO NOT DRILL LARGER
THAN 1/8” DIAMETER)
6) Cut out the solid line area as marked on the template.
7) Remove the template from the duct.
8) Line up holes in the duct bottom with holes on the bracket.
9) Fasten the bracket to the duct bottom using the provided sheet metal screws.
10) With the bracket secure, using the holes on the front flange of the bracket as a guide, drill
5 pilot holes into the duct side.
11) Fasten the top left and top right corners of the front flange to the duct using the provided
sheet metal screws.
12) Slide the humidifier into the bracket and secure Humidifier with 3 remaining screws.
13) Refer to S2020/S2000 Steam Humidifier installation instructions to continue with the
installation.
The model UDB is an optional installation accessory for the S2000 and S2020 Steam
Humidifier. The UDB is designed to ease the mounting process and facilitate removal of
the humidifier for inspection and maintenance
UBD Mounting Bracket
S2000/S2020
Steam Humififier
Cut opening and drill
holes using template.
SUBMITTAL FORM
SUBMITTED BY:
ARCHITECT:
ENGINEER:
CONTRACTOR:
LOCATION:
Place adhesive foam gasket
as shown (sticky side down).