Installation Guide
5 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Pre-Installation (continued)
PRIOR TO INSTALLING THE RAILING
IMPORTANT: Please read and follow the instructions in this section before you begin installation of your railing products.
NOTE: Rail and baluster lengths will vary slightly due to manufacturing processes. Make sure rails and balusters are cut properly to
correct length, and with hole pattern centered between posts before securing.
NOTE: For best results, cut post sleeves with a carbide-tipped blade, minimum 32-tooth.
NOTE: Special installation requirements are needed if using metal surface mount posts. Please contact Fiberon at 1-800-573-8841
fordirection.
□ If using cove moulding, slide the post down into the cove moulding prior to securing any railings (Fig. 1).
Fig. 1
□ Measure the inside distance between properly installed, plumb posts. See Fig. 2 for Line and Stair Railings.
Fig. 2 For Line For Stairs
Maximum rail span
will vary based on the
angle of the stair.
Maximum 70 in. between posts
for 6 ft. line kits.
Maximum 94 in. between posts
for 8 ft. line kits.










