User's Guide
6
INSTALLATION
#3: Installation
Connecting the Switch 2 in a manner inconsistent with this
manual may cause risk to health, life or material damage.
When connecting the Switch 2 act in accordance with the
following rules:
• Connect only in accordance with one of the diagrams,
• Electrical installation must be protected by overcurrent protection
(fuse) of with a value not higher than 10A,
• The Switch 2 should be installed in a wall switch box compliant with
a relevant national safety standards and with depth no less than
60mm,
• Electrical switches used in installation should be compliant with the
relevant safety standards,
• Length of wires used to connect the control switch should not
exceed 10m.
!
Notes for the diagrams:
S1 - terminal for 1st switch (has the function of
activating the learning mode)
S2 - terminal for 2nd switch
L - terminal for live lead
Q/Q1 - output terminal of the 1st channel
Q2 - output terminal of the 2nd channel (only
Double Switch 2)
N - terminal for neutral lead
B - service button (used to add/remove the de-
vice and navigate the menu)
B
QL NS1 S2 L
B
Q1L NS1 S2
DOUBLE
SWITCH 2
FGS-223
Q2
SINGLE
SWITCH 2
FGS-213
Tips for arranging the antenna:
• Locate the antenna as far from metal elements as possible
(connecting wires, bracket rings, etc.) in order to prevent
interferences,
• Metal surfaces in the direct vicinity of the antenna (e.g. ush
mounted metal boxes, metal door frames) may impair signal
reception!
• Do not cut or shorten the antenna - its length is perfectly matched
to the band in which the system operates.