User's Guide

6
INSTALLATION
#3: Installation
Connecting the Switch 2 in a manner inconsistent with this
manual may cause risk to health, life or material damage.
When connecting the Switch 2 act in accordance with the
following rules:
Connect only in accordance with one of the diagrams,
Electrical installation must be protected by overcurrent protection
(fuse) of with a value not higher than 10A,
The Switch 2 should be installed in a wall switch box compliant with
a relevant national safety standards and with depth no less than
60mm,
Electrical switches used in installation should be compliant with the
relevant safety standards,
Length of wires used to connect the control switch should not
exceed 10m.
!
Notes for the diagrams:
S1 - terminal for 1st switch (has the function of
activating the learning mode)
S2 - terminal for 2nd switch
L - terminal for live lead
Q/Q1 - output terminal of the 1st channel
Q2 - output terminal of the 2nd channel (only
Double Switch 2)
N - terminal for neutral lead
B - service button (used to add/remove the de-
vice and navigate the menu)
B
QL NS1 S2 L
B
Q1L NS1 S2
DOUBLE
SWITCH 2
FGS-223
Q2
SINGLE
SWITCH 2
FGS-213
Tips for arranging the antenna:
Locate the antenna as far from metal elements as possible
(connecting wires, bracket rings, etc.) in order to prevent
interferences,
Metal surfaces in the direct vicinity of the antenna (e.g. ush
mounted metal boxes, metal door frames) may impair signal
reception!
Do not cut or shorten the antenna - its length is perfectly matched
to the band in which the system operates.