User Manual
C. Technical appendix
C−5
Festo P.BE−SPC200−EN en 0901d
Wait ţ 10 s
Initialization phase
Switch on the operating
voltage and load voltage at
the same time
Set ENABLE
Switch on the load voltage
Wait ţ 1 s
Create readiness to operate
Wait ţ 10 s
Reset:
ENABLE
STOP
RESET or START/RESET
Switch on the operating
voltage
1
Switch on
operating and load
voltage supplies
at the same
time?
Yes
No
1
2
2
2
1 Operating and load voltage supplies of the SPC200
2 Each voltage must be stable 24 V DC −5/+25 %
Fig.C/1: Create readiness to operate