User Manual
6. Operating the SPC200 with the control panel
6−52
Festo P.BE−S PC200−EN en 0901d
6.8 Test and diagnostic functions of the control panel
A ready−to−operate system is required for some of the
commands in this menu. The following conditions must be
fulfilled:
· the positioning system must be set up completely, wired
and supplied with power and compressed air
· the axis and application data must be set correctly
· the inputs ENABLE and STOP must supply a 1−signal.
After opening the menu you can select whether you wish to
test the:
system functions (SYSTEM) or
the axis functions (AXIS).