User Manual

3. Installation
3−26
Festo P.BE−S PC200−EN en 0901d
3.5 Installing the SPC200
Warning
Before carrying out installation and/or maintenance work,
switch off the following in the sequence specified:
1. the compressed air supply
2. the load voltage for field devices and proportional
directional control valves (plug X2, pin 1)
the load voltage supply for the outputs
(plug X6/X8, pin 8)
if applicable, the load voltage supply on the
axis
interface string
operating voltage supply for internal electronics
of the SPC200 and field devices (plug X2, pin 2).
You can thereby avoid:
uncontrolled movements of the connected actuators
uncontrolled movement of loose tubing
undefined switching states.
Please note
Identify the cable connected to the SPC200. You can then
avoid confusion of similar plugs during conversion work.