Owner's manual

4. Commissioning
4−13
Festo P.BE−CPX−CMAX−SYS−EN en 0908NH
6. Parameterise application data and download it to the
CMAX:
Mass
Supply pressure
Mounting position
This application data is the basis for configuring the con
troller.
7. Set the other parameters (e.g. software end positions,
record list, ...) and download them to the CMAX.
8. Switch on the compressed air supply.
9. Carry out the movement test:
10. Only with incremental position
measuring system: Carry
out homing.
11. Carry out identification run.
12. Carry out a test run.
After commissioning the positioning system (see supple
mental CMAX communication profile" description):
13. Configure the CPX bus node or CPX−FEC.
14. Check the control of the positioning system with the
CMAX.