Installation Instructions

ROUTING ROUTING
BOTTOM BRACKET
CABLE GUIDE
BOTTOM BRACKET
CABLE GUIDE
15
14
We will now begin to route the front derailleur cable by insterting it into the port
found on the drive-side of the frame near the headtube.
The end of the cable will exit through the bottom bracket shell from the front port
found on the non-drive side.
Locate the nylon bottom bracket cable guide and thread the cable through the
opening shown in the photo above.
The image above shows how the assembly should look after threading the cable
during the previous step.