Instructions / Assembly

(E) 4/06
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE
OR CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulb not included.
1.  Install threaded stud by screwing into the half cap 
nut. Insert other end of the threaded stud through 
hole located at bottom of fixture. Then slide font 
from below and lock all together by fastening with a 
small finial.
2. Install large finial by screwing onto top of fixture.
3. Follow enclosed supplement installation instructions 
for electrical and fixture installation onto house 
outlet box. If you do not have an outlet box at 
desired location to attach the fixture than hire a 
qualified electrician to create one.
4. Install fabric shades and bulbs:
A. Install fabric shade onto harps by fastening with 
small finials.
B. Install candle tubes by slipping onto sockets.
C. Install harps by slipping on top of candle tubes.
D. Install bulbs (not included) onto sockets through 
bottom opening of fabric shades. Use type-B of 60 
Watt maximum candelabra base bulbs.
Half
Cap Nut
ASSEMBLY INSTRUCTIONS FOR WB1289
1
3
2
4
Threaded
Stud
Finial
Bulb
(not included)
Small Finial
Large Finial
Fabric Shade
Harp
Candle Tube
Socket
Ball Cap Nuts
Font

Summary of content (1 pages)