Installation Instructions

5
1-800-888-2418 | www.feeneyinc.com
Note: Level cables must terminate at each end post, at each corner post, and at the top of each stair.
Sloped stair cables must terminate at each top and bottom stair post.
a) Review information on determining cable design and assemblies in the CableRail brochure and online
at www.feeneyinc.com.
b) Identify all cable termination posts and calculate the cable run length for each section.
c) Select the assemblies you need.
Standard Cable Assemblies: Pre-packed assemblies including cable with a pre-attached threaded
terminal and a Quick-Connect
®
fitting. Round-up your run lengths to the nearest 5-foot or 10-foot increment
to determine the length of the cable assemblies you’ll need.
Note: Standard CableRail Assemblies are available in the following lengths: 5, 10, 15, 20’, 25, 30’, 40, 50.
Custom Cable Assemblies: Standard assemblies work for most CableRail installation, but if your project
requires a different solution please take a look at custom assemblies using Quick-Connect
®
Fittings.
These easy to use fittings can we used for post or wall attachment, concrete or masonry, angled terminations,
and much more. For more information please visit feeneyinc.com or the Quick-Connect
®
display at
participating dealers.
NOTE:
For 36” railing systems you will require 9 cable assemblies for each cable run section.
For 42” railing systems you will require 11 cable assemblies for each cable run section.
d) Install CableRail Assemblies per installation instructions.
For warranty and maintainence information please visit www.feeneyinc.com
example
Stair and Level Install: Install CableRail Cables