Level Install: Step 2 – Attach Rail Connecting Brackets (RCBs) to Posts
a) Attach the top and bottom isolation pads and Rail Connecting Brackets to each post using the included
screws (see Figures 2.1 & 2.2). The Rail Kits include #10 x 3” wood screws for attachment to wood posts
(as shown), also included are #10 x 1-3/4” self-tapping screws for attachment to non-ferrous metal posts.
Note: The recommended pre-drill size for a #10 self tapping screw is no less than 5/32" (0.157").
Level Install: Step 1 – Prepare post for Rail Connecting Brackets (RCBs)
a) Mark and pre-drill the posts for the Rail Connecting Brackets (RCBs) attachment screws. Each RCB
requires 2 screws. Refer to the correct diagram below based on your railing system height, in order to
detemine hole location dimensions from top of deck. (see Figures 1.1 & 1.2)
LEVEL RAILING INSTALLATION:
(Figure 1.1) (Figure 1.2)
42” RAILING
36” RAILING
(Figure 2.1)
(Figure 2.2)