Manual

Chapter 8: Maintenance and Inspection
Page 8-2
8.1 Inspection Items
A scheduled inspection is recommended to keep the FUSION System in the best condition. A
preventive maintenance routine should be set-up. Recommended inspection schedules are
given for each item.
WARNING:
Follow Lockout/Tagout and other safety precautions when connecting or
disconnecting cabling, wiring, and equipment. Always verify the System is disabled
prior to touching any moveable components
.
8.1.1 Nutrunner (Tool)
Recommended Schedule: Quarterly
It is important to keep the nutrunner tools clean and properly adjusted to ensure correct fas-
tening and accurate system outputs. Inspect each tool, and ensure the following conditions
exist:
All environmental conditions are within the specified ranges.
The duty cycle is within specifications, and the motor is producing normal heat levels.
The tool is producing normal levels of noise and vibration (no irregular noise)
The tool is free from excessive contamination and foreign matter.
The tool is securely mounted, with mounting bolts properly tightened.
The Tool cable is securely connected to the tool.
8.1.2 Tool Cable
Recommended Schedule: Quarterly
This cable connects the tool to the Controller unit. Ensure the following conditions are met:
The cables are free from unnecessary binding, force and tension and are free to move.
The cables are in good condition, sufficiently insulated (no cuts) with no indication of broken
wires.
The cables are free from excessive contamination and foreign matter.
The cables are securely connected to the Controller unit and to the nutrunner (connectors are
tight).
The cables are free from heat distortion, and are not warm or hot to the touch.
The cables and cable connectors are securely and correctly fastened.
(See 4.11.1 for Cable Installation Guidelines)