Chapter 5: Power Up and Initial Checks Chapter 5: Power Up and Initial Checks Page 5-1
Chapter 5: Power Up and Initial Checks 5.1 Before Powering On WARNING: Follow Lockout/Tagout and other safety precautions when connecting and disconnecting cabling, wiring, and equipment. Each item below lists the manual Section(s) that will provide a reference for that specific item. Also refer to Section 3.1 System Block Diagram and Section 4.5 Wiring Diagram. CAUTION: Damage may occur if the 24 VDC and 0 VDC commons are improperly connected. 1. Confirm PLC connection (4.7 and 4.
Chapter 5: Power Up and Initial Checks 5.2 Initial Data Setting After completion of the System verification/power on procedure in Section 5.1, the System is ready for the input of data required for the fastening operation. Chapters 6 and 7 give details on the types of information required and the procedure for entering data into the System. NOTE: All AFC1200 Systems are delivered with application-specific fastening data already setup.
Chapter 5: Power Up and Initial Checks 4. Verify operation of manual start. P Press the START button on the ISA Main Unit and verify that all tools run in the correct direction until the pre-programmed time elapses, creating a TIME reject. The ISA Main Unit "REJECT" light will illuminate and the "TIME" LED on each Axis Unit will light (orange). P Press the RESET button on the ISA Main Unit to clear the REJECT and TIME outputs.