Chapter 5: Power Up and Initial Checks User Console Version A3.
Chapter 5: Power Up and Initial Checks 5.1 User Console Version A3.53 Before Powering On WARNING: Follow Lockout/Tagout and other safety precautions when connecting or disconnecting cabling, wiring, and equipment. Each item below lists the manual Section(s) that will provide a reference for that specific item. Also refer to Section 3.1 System Block Diagram and Section 4.5 Wiring Diagram. CAUTION: Damage may occur if the 24 VDC and 0 VDC Commons are improperly connected. 1. Confirm PLC connection (4.
Chapter 5: Power Up and Initial Checks User Console Version A3.53 NOTE: After an Axis Unit is powered down, the power must not be applied again for at least five (5) seconds. Repeated power up and power down may temporarily disable the Axis Unit. If an Axis Unit does become disabled, keep the power off for five (5) minutes, then power on again.
Chapter 5: Power Up and Initial Checks 5.2 User Console Version A3.53 Initial Data Setting After completion of the System verification/power on procedure in Section 5.1, the System is ready for the input of data required for the fastening operation. Chapters 6 and 7 give details on the types of information required, and the procedure for entering data into the System. NOTE: All AFC1200 Systems are delivered with application-specific fastening data already setup.
Chapter 5: Power Up and Initial Checks User Console Version A3.53 switches are set to the NORMAL position. Press the REV button on the Main Unit to operate all spindles simultaneously as verification of sufficient input power. 4. Verify operation of manual start. P Press the START button on the Main Unit and verify that all tools run in the correct direction until the pre-programmed time elapses, creating both a TIME reject and a TORQUE reject.