Owner manual

FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support: (800) 444-2373 Fax: (651) 645-7390 www.fastestinc.com
2
Bail Handle Compressed Gas Connectors
INSTALLATION
Step 1
Protect the connector from damage and dirt by keeping it in the original packaging until you are ready to use it.
Step 2
Check that the connector part number and delivery notes (if applicable) comply with the application.
Step 3
Connect the hose securely and leak-tight to inlet B (Figure 1). Tighten to a max torque of 15 ft-lbs.
A higher torque can result in damage causing leaks when the system is pressurized.
Ensure that the connectors cannot be damaged when loading and removing the cylinder.
Step 4
Review total function:
Check leak-tight seal
Check if collets open and close properly by actuating
the connector several times
Check if connector marking complies with the
application
The FasTest connector is ready to operate
Note
Avoid lateral forces like short connecting hoses because
this could cause leakage.
Figure 1. Torque to maximum 15 ft-lb
!
CAUTION:
Do not over tighten.
Over tightening could break
connector and cause injury to operator.