Installation Guide
 14
Post Sleeve Installation
BEFORE YOU INSTALL POST SLEEVES
Rail posts may be installed by using the structural posts that support the joists, additional pressure-treated 4x4 (101.6 mm x 
101.6 mm) lumber, or by using a surface mount bracket. The Fiberon Surface Mount Bracket requires that the thickness of the 
decking and reinforcement boards underneath the deck be a minimum of 5 in. (127.0 mm). This equates to two structurally sound 
2 in. x 8 in. (50.8 mm x 203.2 mm) treated lumber boards and one structurally sound 1 in. x 8 in. (25.4 mm x 203.2 mm) treated 
lumber board under the 1 in. (25.4 mm) deck board, unless otherwise specied by local building codes. To optimize post placement, 
additional joists, blocking, or alternative locations may be required. Determine post placement and install reinforcement boards prior 
to installing the deck surface. Use a scaled drawing of your project or the online Fiberon Deck Design Tool to determine where posts 
will be installed. For proper aesthetics, divide the perimeter dimensions evenly so that posts are spaced equally. Composite guardrail 
systems should be secured only to code-compliant posts.
Top of deck Bottom of deck
INSTALLING POST SLEEVES TO STRUCTURAL POSTS
Guardrails can be secured to structural 4 in. x 4 in. (101.6 mm x 101.6 mm) posts, or to 4 in. x 4 in. (101.6 mm x 101.6 mm) posts secured 
to the support framing in a code-approved manner. Always check to ensure posts are plumb and true. Check maximum and minimum 
distance requirements for the railing that is being installed to ensure a snug t and proper baluster spacing.