Installation Manual
IBRInstallationGuide
Page7of40 Doc#770‐00001‐13
Sept.21,2014
ReturntoTableofContents
2. GettingStarted
2.1 PhysicalInspection
Priortoopeningtheshippingcrate,inspectitvisuallyforevidencethatithasbeenopenedormishandled.
Afteropeningthecrate,carefullyinspectthecontentsforcompletenessorevidenceofdamageortampering.
Intheeventtheshippingcrateisdamagedorthecontentsaredamagedorincomplete,notifyFastback
Networksbytelephone,fax,oremail.Theshippingcrate,dividers,andpackingmaterialsshouldberetained
foruseintheeventthatequipmentmustbereturnedtoFastbackNetworks.
AfterremovingIBRfromitspackingcrate,recordtheserialnumberandproductnumber(e.g.,75JPor57JP),
bothofwhichwillbeneededincaseitisnecessarytoseekassistancefromFastbackNetwork’sCustomer
SupportGroup.
DONOTOPENIBRFORANYREASON.DOINGSOWILLVOIDTHEWARRANTYANDMIGHTCREATEA
SAFETYHAZARDAND/ORCAUSETHEEQUIPMENTTOBEOUTOFCOMPLIANCEWITHREGULATIONS.
DONOTATTEMPTTOAPPLYPOWERTOANIBRTHATSHOWSSIGNSOFDAMAGE,TAMPERING,OR
MISHANDLING.
2.2 Inventory
Thefollowingcomponentsarerequiredforsuccessfulinstallationofalink:
a. OneIBR101andoneIBR102,eachofwhichincludesthefollowing:
ThreeweatherproofRJ‐45cable‐endconnectorsforCAT5E&CAT6cables
*
;
Aweatherproofcapforthefour‐pinserialconnectorthatisattachedtoIBRwhentheIBRserial
connectorisnotinuse*.
TwoweatherproofcapsforRJ‐45connectorsthatareattachedtoIBRwhentheIBRRJ‐45connectors
arenotinuse*.
Atwo‐meterserialcablewithaDB‐9connectorononeendandafour‐pinconnectorontheother
end;