Installation Manual
IBRInstallationGuide
Page21of40 Doc#770‐00001‐13
Sept.21,2014
‐ Groundterminationsshouldbecoatedwithano‐oxidecompoundsuchasadielectricgreaseto
protectthegroundconnectionsagainstoxidation.
‐ Groundshouldbeterminatedwith#6AWGsolidgroundwiretoalocalTelcogroundingbus.
‐ Thesurgesuppressorshouldbegroundedinaccordancewithitsmanufacturer’sspecifications.
Handtoolsandmaterialsasappropriateforthemountinglocationsthatwillbeused:
‐ Polemount:Bandingstraporhoseclamp,maximum¾”strapwidthofappropriatelengthforthe
polediameter.Note:Whenmountedonapole,FBN’sarticulatingmountrequiresthatthepolehave
aminimumdiameteroftwoinches(5.08cm).
‐ Wallmount:8mmor5/16”diameterboltappropriateforthemountingsurface.
‐ Torquewrenchtotightenallconnectionsto10ft‐lbs(138kgf‐cm).
‐ 2x13mmopen‐endedwrenchorsocketsfortheM8mountingbolts.
‐ 5mmAllenwrenchforthesocketbutton‐headcapscrewstoattachthemounttotheIBR.
Ethernetconnections:
‐ 17mmopen‐endedwrenchtotightentheweatherizedEthernetboot.SeethesectiononEthernet
connectorsfortorquespecifications.
‐ RJ45Ethernetterminationtools.
‐ Ethernetcables.TheIBRhasanintegratedswitchandcanacceptupto3individualEthernet
connections,thoughonlyoneisabsolutelyrequiredtopassdata.
Serialconnection(requiredforinitialconfiguration).
USB‐to‐DB9converter.RequiredifthePCusedforconfigurationdoesnothaveaDB9connector.Most
PCsdon’thaveaDB9connector,sothisusuallywillberequired.
Asafeandsuitablemeansofliftingtheequipmentandinstallerattheinstallationsite.(NOTE:The
mountingbracketforIBRhasholesthatcanbeusedtosuspendIBRfromautilitybeltorotherwiseas
anaidinliftingIBR.)
ShieldedEthernetcable.
AlaptopforconfiguringIBR.
6.3 IBRMountingBracket
IBRmustbemountedonasuitablebracketthatwillholdIBRsecurelyunderallenvironmentalconditions.
ThebaseofIBRhasfourmountingpostsformountingboltsset
inasquarepattern.Operatorshavethe
optiontouseamountingbracketpurchasedfromFastbackNetworksortocreatecustommountingsolutions.
Fastbackoffersabracketthatcanbemountedeitheronawallorapolehavingaminimumdiameteroftwo
inches(5.08cm).Instructionsforinstallingthisbracketareshownbelow.
6.3.1 MountingLocation‐ChoosingthebestpossiblemountinglocationforIBRisimportantforsafety,security,
andlinkperformance.
InstallIBRinalocationwhereaccessisrestrictedtoauthorizedservicepersonnel.
SelectalocationthatiswithinonehundredmetersofaPoE+source.
Avoidlocationsthatmightpresenthazardstoinstallationormaintenancecrews.