Fast & Fluid Management Srl A Unit of IDEX Corporation GIOTTO COMPACT DISPENSER MANUALE MANUAL DISPENSER DISPENSER MANUEL Installazione – Istruzioni operative Installation – Operating instructions Installation – Instructions pour opérer Pag. 2 Page 12 Page 22 Fast & Fluid Management Srl Via Pelizza da Volpedo n° 109/111 20092 Cinisello Balsamo ( Mi) Italy Tel. : +39 02.66091.1 Fax : +39 02.66091.550 Web : www.fast-fluid.
Fast & Fluid Management Srl A Unit of IDEX Corporation 1.- INTRODUZIONE Il dispenser manuale Giotto e' un prodotto principalmente studiato per il dosaggio di coloranti per l' edilizia, alcune delle sue parti sono particolarmente precise per garantire risultati di dosaggio in accordo con lo standard dei produttori piu' importanti. L' unita' base e' l' oncia fluida Y = 29.58 cc o il sistema ibrido Y = 31.23 cc.
Fast & Fluid Management Srl A Unit of IDEX Corporation 3.- MONTAGGIO Individuare la fiancata destra (2) e quella sinistra (3). Porre il pannello superiore (1) nella corretta posizione di assemblaggio. Assemblare utilizzando le viti tipo “C”. Montare alle fiancate (2) e (3) il pannello posteriore (4) e il tirante (8) utilizzando viti tipo “B”.
Fast & Fluid Management Srl A Unit of IDEX Corporation 4- COLLEGAMENTO DEL COMPUTER 1) 2) 3) 4) Inserire la CPU sul ripiano intermedio e fare uscire i cavi dai fori posti sulla struttura. Appoggiare il monitor al piano d' appoggio superiore. Appoggiare la tastiera incastrando i piedini della tastiera stessa negli appositi alloggiamenti. Collegare monitor e tastiera alla CPU come nello (SCHEMA 3) SCHEMA 3 5.- CONTROLLO Azionare l' interruttore principale (1) (SCHEMA 4).
Fast & Fluid Management Srl A Unit of IDEX Corporation Regolare il timer (2) su un tempo di circa 5 minuti e controllare se la macchina lavora correttamente. Durante questa fase, la piastra dei contenitori deve venire ruotata in tutte le posizioni fino a quella iniziale. Non appena il tempo impostato sara' scaduto, l' apparecchio si interrompera' automaticamente. In caso di un qualsiasi disturbo, estrarre la spina dalla presa di corrente e richiedere l' intervento di un tecnico. SCHEMA 4 6.
Fast & Fluid Management Srl A Unit of IDEX Corporation SCHEMA 6 Mettere in funzione l' apparecchio (agitatore elettrico) mediante l' azionamento dell' interruttore principale e del timer. 7.-COLLAUDO Regolare le astine (1) e (2) della pompa di dosaggio, al valore massimo ed azionare , i pistoni corrispondenti (ROSSO e NERO) su e giu’ in modo normale ma con la valvola di ditribuzione chiusa. Accertarsi che con gli ultimi movimenti della pompa non si sia verificato alcun gorgogliamento nel contenitore.
Fast & Fluid Management Srl A Unit of IDEX Corporation 8.- ELIMINAZIONE DELL' ARIA Regolare l' astina della pompa nera sul valore 3Y (2) e l' astina della pompa rossa sul valore 19 (1) (SCHEMA 8). Aspirare il prodotto mediante sollevamento dei pistoni (3). Aprire la valvola (SCHEMA 9), estrarre il prodotto e versarlo in un recipiente vuoto, appositamente preparato, mediante spinta del pistone fino alla posizione inferiore finale. Riportare le astine sul valore "O".
Fast & Fluid Management Srl A Unit of IDEX Corporation 9.- ISTRUZIONI PER IL DOSAGGIO 1) 2) 3) 4) Assicurarsi di aver identificato il colore desiderato nell' elenco delle formule. Idenificare la misura del barattolo per la corretta quantita' e mettere il barattolo del colorante base aperto sul ripiano direttamente sotto l' ugello della valvola. In accordo con la quantita' richiesta regolare i calibri sul valore corretto bloccando la manopola.
Fast & Fluid Management Srl A Unit of IDEX Corporation - Verificare che dalla valvola e dal canestro non ci siano perdite, se richiesto sostituire l' "O" Ring smontando la valvola come indicato nello (SCHEMA 9). Quando il canestro viene svuotato per la pulitura e la manutenzione e' necessario ripetere il processo di "Preparazione Dispenser". 11.- PULIZIA DEI CONTENITORI d) e) f) Estrarre dai contenitori tutta la vernice.
Fast & Fluid Management Srl A Unit of IDEX Corporation b) c) d) e) f) l' unita' del pistone. Estrarre il pistone interno dal pistone esterno. Togliere la guarnizione usurata (tutti i quattro pezzi) senza danneggiare il pistone. Lavare ed asciugare molto accuratamente le guarnizioni. Lubrificare leggermente il pistone (il lubrificante dovrebbe essere compatibile con la vernice). Rimontare le guarnizioni (SCHEMA 11) Durante questa fase di rimontaggio, procedere sempre con molta attenzione.
Fast & Fluid Management Srl A Unit of IDEX Corporation riempire di nuovo con colorante fresco. _______________________________________________________________________________________________ 1155007C-it,en,fr.
Fast & Fluid Management Srl A Unit of IDEX Corporation 1.- INTRODUCTION Giotto manual dispenser is a product particularly developed for dosing the colourants for building paints, some of its parts are particularly precise to guarantee dosing results in compliance with the standard of the most important producers. The base unit is the fluid ounce Y = 29.58 cc or the hybrid system Y = 31.23 cc.
Fast & Fluid Management Srl A Unit of IDEX Corporation 3.- ASSEMBLY Identify the right side (2) and the left one (3). Put the superior plate (1) in the corret assembly position. Assemble using screws type “C”. Assemble on the sides (2) and (3) the back panel (4) using screws type “B”. Assemble the guide (5) and (6) with the angulars (7) on the side (2) using screws type “D”.
Fast & Fluid Management Srl A Unit of IDEX Corporation DIAGRAM 2 4.- CONNECTION OF THE COMPUTER 1) 2) 3) 4) Insert the CPU on the intermediate shelf and pass cables through the holes on the frame. Position the monitor on the superior plate. Position the keyboard putting its feet in the slots provided . Connect the monitor and the keyboard to the CPU as indicated in (DIAGRAM 3). DIAGRAM 3 _______________________________________________________________________________________________ 1155007C-it,en,fr.
Fast & Fluid Management Srl A Unit of IDEX Corporation 5.- CONTROL Operate the main switch (1) (DIAGRAM 4).The green led (3) will light : this means that the electrical supply is connected. Set the timer (2) with a time of about 5 minutes and check that the machine works correctly. During this phase the turning table has to be rotated in all position, until it returns to the starting point. When the set time is over, the device will automatically stop.
Fast & Fluid Management Srl A Unit of IDEX Corporation DIAGRAM 6 Start up the stirring device, by switching on the main switch and setting the timer. 7.- TESTING Set the rods (1) and (2) of the pump to the maximum level and move the corresponding pistons (Red and Black) up and down in a normal manner but with the distribution tap closed. Verify that with the last movements of the pump in the container no bubbling takes place, Otherwise, continue operating the pistons untill the bubbling desappears.
Fast & Fluid Management Srl A Unit of IDEX Corporation 8.- ELIMINATION OF THE AIR Set the rod of the black pump on the value 3Y (2) and the rod of the red pump on the value 19 (1) (DIAGRAM 8).Draw in the colourant by lifting the pistons (3). Open the valve tap (DIAGRAM 9)push the pistons down to the bottom position forcing the colourant out of the pump and into an empty container placed under the tap. Bring the rods back to value "O". Repeat the same operation with all containers.
Fast & Fluid Management Srl A Unit of IDEX Corporation 9.- DOSING INSTRUCTIONS 1) 2) 3) 4) Be certain to have identified the colour from your formula data base. Identify the can size for the correct quantity and place the open can of base paint on the shelf directly under the nozzle of the valve.
Fast & Fluid Management Srl A Unit of IDEX Corporation 11.- CONTAINER CLEANING d) e) f) Extract all paint from the containers Put inside about 1 liter water and let operate for about 15 minutes together with the simultaneous action of the stirrers Empty completely the containers operating the pumps : in this way it is possible to clean the containers, the pistons and the valve.
Fast & Fluid Management Srl A Unit of IDEX Corporation 12.- NOTES If when starting the device through the rotation of the main switch to position "1" the green led doesn't light, extract the electrical plug from the socket tap and control the lamp. If necessary substitute it If the switch returns automatically to position "O" try to operate it after few minutes : if the problem continues , ask for the intervention of a technician.
Fast & Fluid Management Srl A Unit of IDEX Corporation 13.- FURTHER NOTES The electrical plug has to be connected to a mains socket which is correctly earthed. During any maintenance operation or by any intervention on the machine , the electrical plug must absolutely be extracted from the socket. Before starting the machine with the timer, verify that all covers of the containers have been correctly blocked. The sound emission relative to the work station is less than 70 dB. 14.- WHAT TO DO IF. . .
Fast & Fluid Management Srl A Unit of IDEX Corporation 1.- INTRODUCTION Le dispenser manuel Giotto est un produit étudié principalement pour le dosage des colorants pour l'industrie du bâtiment; quelque partie du dispenser est particulièrement précise pour assûrer des résultats de dosage conformes au standard des producteurs les plus importants. L'unité base est l'once fluide Y = 29.58 cc ou le système hybride Y = 31.23 cc.
Fast & Fluid Management Srl A Unit of IDEX Corporation Identifier la joue droite (2) et celle gauche (3). Placer le panneau supérieur (1) dans la position d'assemblage correcte. Assembler en utilisant les vis type “C”. Sur les joues (2) et (3) monter le panneau postérieur (4) et le tirant (8) en utilisant des vis type “B”. Prémonter les guides (5) et (6) avec les angles (7) sur la joue (2) en utilisant des vis type “D“.
Fast & Fluid Management Srl A Unit of IDEX Corporation 4.- CONNEXION DE L'ORDINATEUR 1) 2) 3) 4) Placer la UC sur le rayon moyen et faire sortir les câble des trous de la structure. Poser le moniteursur la surface d'appui supérieure. Poser le clavier et bloquer ses pieds dans les relatifs sièges. Connecter moniteur et clavie à la UC comme indiqué dans le (SCHÉMA 3). SCHÈMA 3 5.- CONTROLE _______________________________________________________________________________________________ 1155007C-it,en,fr.
Fast & Fluid Management Srl A Unit of IDEX Corporation Actionner l'interrupteur principal (1) (SCHÉMA 4). La lumière verte (3) va s'allumer: ce signifie que l'alimentation électrique est correcte. Régler le timer (2) sur une durée de environ 5 minutes et vérifier si la machine travaille correctement. Pendant cette phase, la plaque des conteneurs doit être tournée dans toutes les positions jusqu'à celle initiale. A la fin du temps sélectionné, l'appareil va s'interrompre automatiquement.
Fast & Fluid Management Srl A Unit of IDEX Corporation SCHÉMA 6 Mettre l'appareil (agitateur électrique) en fonction en agissant sur l'interrupteur principal et le timer. 7.- ESSAI Régler les tiges (1) et (2) de la pompe de dosage sur la valeur maximale et actionner les relatifs pistons (ROUGE et NOIR) (3) de façon régulière, mais avec le soupape de distribution fermé. Vérifier que pendant les derniers mouvements de la pompe il n'a pas eu lieu aucun bouillonnement dans le conteneur.
Fast & Fluid Management Srl A Unit of IDEX Corporation 8.- ELIMINATION DE L'AIR Régler la tige de la pompe noire sur la valeur 3Y (2) et la tige de la pompe rouge sur la valeur 19 (1) (SCHÉMA 8). Aspirer le produit au moyen du soulèvement des pistons (3). Ouvrir le soupape (SCHÉMA 9), extraire le produit et le verser dans un récipient vide, expressement préparé, par poussée du piston jusqu'à la position inférieure finale. Rémettre les tiges sur la valeur "O".
Fast & Fluid Management Srl A Unit of IDEX Corporation 9.- INSTRUCTIONS POUR LE DOSAGE 1) 2) 3) 4) Vérifier d'avoir identifié la couleur desirée dans la liste des formules. Identifier la mesure du pôt pour la correcte quantité et placer le pôt du colorant de base ouvert sur le rayon, directement sous la buse du soupape. Selon la quantité nécessaire, régler les calibres sur la valeur correcte en bloquant la poignée.
Fast & Fluid Management Srl A Unit of IDEX Corporation - Vérifier l'absence de déperditions du soupape et du panier; si nécessaire remplacer l' "O" Ring après avoir démonté le soupape comme illustré dans le (SCHÉMA 9). Quand le panier vient vidé pour le nettoyage et l'entretien il faut répéter le processus de "Préparation Dispenser". NETTOYAGE DES CONTENEURS d) e) f) Extraire toute la vernis des conteneurs.
Fast & Fluid Management Srl A Unit of IDEX Corporation Si l'interrupteur continue a déclancher automatiquement sur la position "O", essayer à l'actionner de nouveau après quelque minute. Si le même problème se répète, demander l'intervention d'un technicien. En cas de déperditions de la pompe, remplacer les garnitures (chaque machine fournie è complète avec une garniture de réchange).
Fast & Fluid Management Srl A Unit of IDEX Corporation Avant d'allumer la machine par actionnement du timer, vérifier que tous les couvercles des conteneurs ont étés correctement bloqués. L' emission de bruit relative à la station de travail est au-dessous de 70 dB. 14.- PROBLEMES ET POSSIBLES SOLUTIONS - Pendant les opérations de dosage le colorant sort à giclées. >> Vérifier la quantité de colorant dans le panier.