Installation Guide
318267-1
FAST 2K™ DECK POST ANCHOR
Installation Instructions
January 2021
North America
H.B. Fuller | Royal Adhesives & Sealants Canada Ltd
266 Humberline Drive | Toronto, Ontario, Canada M9W 5X1
Tel. +1 416 679 5676 | Fax: +1 416 679 0511 | hbfuller.com
fast2k.com
FOR PROFESSIONAL USE ONLY
PRODUCT DESCRIPTION
Fast 2K™ Deck Post Anchor is a patented expanding composite that fills the peripheral void between a post and the hole for load bearing
applications. In combination with a post, Fast 2K™ Deck Post Anchor forms a high-strength composite that structurally supports patio
decks, porches, verandas, barns, sheds and other accessory structures. In 3-5 minutes, Fast 2K™ Deck Post Anchor is strong enough
to support posts and within in 15-30 minutes of pouring, building can begin on the posts.
Fast 2K™ Deck Post Anchor has been third party tested and was found to perform as well as concrete for load bearing applications.
Fast 2K™ Deck Post Anchor has found comply with Section 1807.3 of the International Building Code and Subsection 9.12.3 of Division B
of the National Building Code (NBC) of Canada 2015.
INSTALLATION INSTRUCTIONS
Fast 2K™ Deck Post Anchor is available in the following packaging:
• Retail cases of 10 x 33.8 fl.oz. (1 L) divided bags.
• Contractor cases of 12 x 33.8 fl.oz. (1 L) divided bags.
• Cases of 2 x 0.79 gal (3 L) sets of jugs.
• Sets of 15 gallon (60L) drums.
• Also available in 55 gallon (200L) drums or 275 gallon (1000L) totes. Please contact your sales professional.
NOTICE: For load bearing applications, posts must be set at least 6” below the frost line. Post must be at a depth such that at least
25% of the post length is under ground. Hole diameter should be selected to ensure the footing can handle the intended load (use the same
diameter hole as would be used with concrete). Ideally, posts should be set in the middle of the hole but can be placed off-centre
to accommodate necessary post location for deck construction. Between 3 - 6" of soil should be placed on top of the cured Fast 2K™ Deck
Post Anchor to prevent damage in the event of fire.
1. While Fast 2K™ Deck Post Anchor can be installed at ambient temperatures ranging from -5°F to 105°F (-20°C to 40°C),
Fast 2K™ Deck Post Anchor should be acclimatized to 65°F - 80°F (18°C - 27°C) for 1-2 hours prior to use to provide optimal
International Code Council
ESR-4077
Canadian Construction Materials Centre
Report # 14054-R
U.S. Patent No. 10,364,544.
U.S. Patent No. 10,738,435.
Other patents pending