Submittal Sheet

Dimensions & Airflow
Clearance of 8” (203 mm) in front of the unit is recommended for removal of core. All units feature three foot
plug-in power cord with 3-prong plug.
Model
A B C D E
in mm in mm in mm in mm in mm
FIT 120E 30
1
/
2
775 19 485 8
3
/
4
222 2 51
1
/
2
14
Ventilation Performance
in.wg. (Pa) 0.2 (50) 0.4 (100) 0.6 (150) 0.8 (200)
cfm (L/s) cfm (L/s) cfm (L/s) cfm (L/s)
Net supply airow 125 (59) 106 (50) 89 (42) 70 (33)
Gross supply airow 129 (61) 110 (52) 93 (44) 74 (35)
Gross exhaust airow 129 (61) 110 (52) 93 (44) 74 (35)
Energy performance
Heating
Supply temperature Net airow Consumed power
Sensible recovery
efciency
Apparent sensible
effectiveness
Latent recovery/moisture
transfer
F C cfm L/s W % % %
32 0 65 31 82 65 85 55
32 0 85 40 112 64 80 50
32 0 98 46 148 63 78 48
5 -15 66 31 82 56 80 45
Cooling 95 35 47 22 82 45
1
1
Total recovery efciency
United States 10048 Industrial Blvd. • Lenexa, KS 66215 • 1.800.747.1762 • www.fantech.net
Canada 50 Kanalakt Way • Bouctouche, NB E4S 3M5 • 1.800.565.3548 • www.fantech.net
Fantech, reserves the right to modify, at any time and without notice, any or all of its products’ features, designs,
components and specifications to maintain their technological leadership position.
Requirements and standards
Complies with the UL 1812 requirements regulating the construction and installation of Heat Recovery Ventilators
Complies with the CSA C22.2 no. 113 Standard applicable to ventilators
Complies with the CSA F326 requirements regulating the installation of Heat Recovery Ventilators
Technical data was obtained from published results of test relating to CSA C439 Standards
ERV Core ISO 846 certied for mold and bacteria resistance
HVI certied
0 20 40 60 80 100 120 140 160
0 9 19 28 38 47 57 66 76
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
0
50
100
150
200
250
300
350
400
1
2
3
Reduced Speed
Med. Speed
Supply/Exhaust
Normal Speed
1
2
3
Airow (L/s)
Airow (cfm)
Static Pressure (in H
2
O)
Static Pressure (Pa)
fresh air
to inside
fresh air
from outside
stale air
from inside
stale air
to outside
D
C
A
B
E
Distributed by:Contacts
Submitted by: Date:
Quantity: Model: Project #:
Comments:
Location:
Architect:
Engineer: Contractor:
Electrical power cord