Manual

Section
2:
Installation
Pillar and Beam
Assembly
1. Thread the two (2) Pillar Support Rods (#1) into the tapped holes provided in the base.
•
The end with the longer thread should fit into the platform (about 1⁄2
i
n
c
h
).
2. Place the Pillar (#2) down over the support
rods with the pillar cut-outs facing the right and
left of the platform.
3. Insert the Steelyard Rod (#35) down through
the pillar.
•
The bent hook on top; the loose
S
w
i
v
e
l
Hook on the bottom.
•
The hook opening should be toward the
platform when properly placed.
•
DO NOT remove the washers from the
Steelyard
R
od
.
4. Hook the Steelyard Rod (#35) to the
Long
Lever Tip Pivot (
#34).
•
Temporarily, hook the upper end of
the
Steelyard Rod on the pillar
cut-out.
Hook the Steelyard Rod to
the
Long Lever Tip
Pivot.
03/13 14 50699 Rev. 4